Reborn Tech Scholar

Chapter 524 Transformation of a Fission Nuclear Power Plant into a Fusion Nuclear Power Plant



Chapter 524 Transformation of a Fission Nuclear Power Plant into a Fusion Nuclear Power Plant

Chapter 524 Transformation of a Fission Nuclear Power Plant into a Fusion Nuclear Power Plant

Qin Yuanqing didn't say much about whether to provide desert control services to the outside world, because he believed that the relevant departments could weigh the pros and cons and handle this matter well.

At this time, Qin Yuanqing began to hold a meeting as the commander-in-chief of the 'Golden Crow Project' to discuss where to build a fusion nuclear power plant!

After all, the two experiments of the 'Golden Crow Device' were all successful. When conducting various researches in the scientific research center, where to build a fusion nuclear power plant has become a necessary and urgent matter. After all, the controllable nuclear fusion has been successful. Utilizing it is the most important thing, that is to say, the 'Golden Crow Project' has entered the second stage.

According to international practice, the site selection requirements for nuclear power plants are very high.According to the internationally accepted site selection principles, factors such as geology, surface, meteorology, hydrology, environmental protection, civil engineering, transportation, power station technology, power grid, and society must be strictly considered.

First of all, geographically, nuclear power plants must be built in relatively remote areas of economically developed areas, and large and medium-sized cities cannot be located within 50 kilometers.It is required that no fault zones pass through the deep part of the site, and that there are no active faults within a few kilometers of the nuclear power plant. The site is 100 kilometers from the sea and 50 kilometers inland. There has never been an earthquake of magnitude 6 or above in history, and there has been no occurrence in the site area for 600 years. The tectonic setting of the magnitude 6 earthquake.From the perspective of nuclear safety, the siting of nuclear power plants must take into account the protection of the public and the environment from the excessive radiation caused by the release of radioactive accidents, and at the same time, the impact of sudden natural or man-made events on nuclear power plants must be considered. Therefore, nuclear power plants It must be selected in an area with low population density and easy isolation.

In addition, nuclear power plants will generate huge heat during operation, so the location of nuclear power plants must be close to water sources, preferably by the sea. This is also an important reason why large nuclear power plants are built by the sea, and the sea can also solve the transportation of large equipment question.In the event of a hazard, with flat coastlines and a uniform spread of radiation, the contaminated land area is only half that of being fully inland.However, while building on the seaside is beneficial, there is also an additional risk, which is the possibility of large waves brought by tsunamis or typhoons.Breakwaters are usually built to withstand the impact of huge waves.However, the breakwater can only withstand a certain degree of impact. If it is a relatively large tsunami, the breakwater is powerless and may have very serious consequences.

Of course, this is a fission nuclear power plant. As a fusion nuclear power plant, its safety has been greatly improved, but because its volume will be much larger, it will face many problems.

However, unlike other countries that need to rebuild fusion nuclear power plants, Huaxia has reserved space and possibility for future nuclear fusion reconstruction under the intervention of Qin Yuanqing when it built ten modern nuclear power plants.

So what they need to do is to select one of these ten fission nuclear power plants and transform it into a fusion nuclear power plant.

After comprehensive consideration of various factors, coupled with some emotional biases of Qin Yuanqing, the fusion nuclear power plant was finally selected as the Yunxiao Nuclear Power Plant in Narcissus City, Fujian Province!

In today’s Fujian Province, the GDP of the three cities in southern Fujian has exceeded the trillion level, and the GDP of the provincial capital Rongcheng has also exceeded the trillion level. It ranks fifth in the country, second only to Guangdong, Jiangsu, Shandong, and Zhejiang provinces!

The fusion nuclear power plant is located here, and there is no doubt that it can install a powerful engine for Fujian Province and allow Fujian Province to develop faster.

Such a fusion nuclear power plant, together with some medium and large hydropower stations in Fujian Province, can meet the power demand of the entire Fujian Province, and even provide power like Guangdong Province!

After the meeting determined the location of the site, the relevant person in charge soon contacted the relevant departments of Fujian Province to coordinate work.

The owner of Yunxiao Nuclear Power Plant is Huahe Guodian Narcissus Energy Co., Ltd., and its main shareholder is Huaxia Nuclear Power Co., Ltd.

Soon the relevant documents were issued to the corresponding units. At the same time, the relevant departments entered the nuclear power plant, and the security work was implemented immediately. Even when the documents had just arrived at the owner's unit, a regiment-level field force had already arrived This area has been deployed, and military control of the area and surrounding areas has been carried out.

Qin Yuanqing arrived at the nuclear power plant with a group of engineers from the nuclear industry group. Among them were the chief engineer of the nuclear industry group, the person in charge of the design of the nuclear power plant, the chief engineer of design, the project manager of the nuclear power plant construction, the person in charge of the main technology, and the general manager. engineer!

"This nuclear power plant has built 12 AP1000 nuclear power units, all of which are Hualong No. 1500. The civil construction was completed by Huaxia Nuclear Industry 450 Construction Co., Ltd., with a total installed capacity of 150 million kilowatts, an annual output value of 60 billion yuan, and an annual profit and tax of [-] billion yuan. !" The leader of the nuclear power plant introduced: "The reactor type is a pressurized water reactor, and the design life is [-] years!"

"Can the design data of the nuclear power plant be checked with the construction site?" Qin Yuanqing asked, looking at the chief engineer of the design unit.

"Academician Qin, you can rest assured that during the construction of the nuclear power plant, there will be a dedicated design team as the resident representative to follow the construction throughout the process and control the construction according to the design!" said the chief designer firmly.

Qin Yuanqing and the engineers of the Nuclear Industry Group conducted an on-site inspection of the nuclear power plant site and exchanged opinions on the design of the demonstration reactor.

Although it is said that the "Golden Crow Device" can be directly transplanted in as the core reactor, but after all, the existing nuclear power plant has specific conditions, and whether it can be directly transplanted to exert the best performance is another matter.

At the same time, the researchers and engineers who received the transfer orders rushed over from major research institutions and the scientific research centers of the 'Golden Crow Project' to participate in transforming this fission nuclear power plant into a fusion nuclear power plant.

How to transform a fission nuclear power plant into a fusion nuclear power plant at the most suitable cost is a big issue, which is related to the success or failure of the second phase of the entire "Golden Crow Project".

Economy and technology always need to be considered comprehensively in order to find a balance in the middle.

And not only that, as the energy center of Fujian Province in the future, it can almost be said to supply the electricity of the entire Fujian Province, so the reconstruction of the nuclear power plant alone is not enough, and it also involves the integration of various high-voltage towers and high-voltage lines. project.

This large project will accumulate experience and provide assistance for the reconstruction of other nuclear power plants in the future!

It can be said that the transformation of a fission nuclear power plant into a fusion nuclear power plant seems to be a point, but it is actually a plane, or even a three-dimensional, involving all aspects.

For this reason, the researchers and engineers transferred by Qin Yuanqing formed a team of 2000 people, who were stationed in Fujian Province to carry out research, research, and design, so as to facilitate the orderly development of next year.

Qin Yuanqing took the time to go back to his hometown during the preliminary investigation. After all, the nuclear power plant is only an hour away from his hometown, which is not far. great sentiments.

Gradually, as the research continued to deepen and more and more information was gathered, in less than a month, Qin Yuanqing gradually had a clear idea.

First of all, 12 AP1000 nuclear power units are definitely far from enough. After all, the nuclear power plant that will be rebuilt in the future will supply the entire Fujian Province. 12 AP1000 nuclear power units are far from enough, and they cannot use AP1000 nuclear power units Instead, it should be a magnetic fluid generator set. After preliminary calculations, 150 magnetic fluid generator sets are needed, of which 20 magnetic fluid generator sets are used as backup units.

In this case, more than 50 kilograms of heavy water will be used up in a day!

It seems that there is a lot of heavy water, but even based on the most expensive price, 4000 yuan per kilogram, about 20 yuan for 24 kilograms of heavy water, and [-] yuan for [-] kilograms of heavy water.

However, the fuel of up to 24 yuan per day is enough for the entire Fujian Province for one day, and there is still a surplus for Guangdong Province.

Of course, the project is also carried out in stages. The first phase is the construction of the demonstration reactor, which is basically optimized and modified based on the "Jinwu device" designed by Qin Yuanqing.The second phase is the construction of magnetic fluid generators.

It will take up to two years to transform the entire fission nuclear power plant into a fusion nuclear power plant, and then to reorganize the high-voltage towers and high-voltage lines.

The team formed by Qin Yuanqing himself is still under the leadership of the 'Golden Crow Project' headquarters, and their role is to complete the design of the entire plan, including investment, this year.Wait until next year to start construction directly.

After the team was formed and the leaders were appointed, Qin Yuanqing left again and returned to the scientific research center of the 'Golden Crow Project'. It was impossible for him to transform the fission project into a fusion project. He just had to be in the nuclear power plant all the time. He only needed to be in charge of the beginning and later Naturally, there is a team to complete it, otherwise, Qin Yuanqing still feels that he is not enough if he is split into two halves or even ten halves.

After Qin Yuanqing returned to the scientific research center, this 'Golden Crow Device' had completed the experiment of stable operation for 2 hours and 3 hours continuously, and the temperature of the experiment was [-] million degrees Celsius. After the test of the stable operation time, it will react Chamber temperature test.

In the back, there are tests in other aspects. For these tests, all kinds of materials are backed up, and there are more than one backup. Once a problem occurs in a certain part, it will be inspected, replaced, and repaired by the corresponding engineer.

This scientific research base will not be used for a few years. According to the plan, it will be converted into a fusion nuclear power plant for the use of Long Province. After all, the corresponding resources can be reused in this way instead of being scrapped directly, resulting in a huge waste of resources.

As for the scientific researchers in the scientific research center, after their missions are completed, the organization will naturally make corresponding arrangements, and these will naturally follow the flow and flow naturally!

When Qin Yuanqing returned to the scientific research center, he mainly dealt with his own work. After all, many things required his signature and consent to be useful!

(End of this chapter)


Tip: You can use left, right, A and D keyboard keys to browse between chapters.